A photostream of all sorts of images pertaining to NASA's space shuttle program.
All photos are credited to their respective photographers; click through to see the original source.
Unaffiliated with NASA or any of its subsidaries.
Blue mach diamonds signal the speed and force at which Space Shuttle Endeavour roars into space after a perfect launch. Liftoff occurred on time at 10:06:01 p.m. EST. The Shuttle and its five-member crew will deliver U.S. solar arrays to the International Space Station and be the first Shuttle crew to visit the Station’s first resident crew. The 11-day mission includes three spacewalks. This marks the 101st mission in Space Shuttle history and the 25th night launch. Endeavour is expected to land at KSC Dec. 11 at 6:19 p.m. EST
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
27 notes
|
|
#nasa
#space shuttle
#endeavour
#sts 97
#liftoff
#launch
|
In a perfect, on-time launch, Space Shuttle Endeavour breaks away from the billows of smoke and steam around Launch Pad 39B. Liftoff of Endeavour occurred at 10:06:01 p.m. EST on mission STS-97. Endeavour and its five-member crew will deliver U.S. solar arrays to the International Space Station and be the first Shuttle crew to visit the Station’s first resident crew. The 11-day mission includes three spacewalks. This marks the 101st mission in Space Shuttle history and the 25th night launch. Endeavour is expected to land Dec. 11 at 6:19 p.m. EST
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
24 notes
|
|
#nasa
#space shuttle
#sts 97
#launch
#liftoff
#endeavour
#Kennedy Space Center
#cape canaveral
|
The payload transport canister, with the P6 integrated truss segment inside, is close to the payload changeout room on the Rotating Service Structure (RSS) at left. The PCR is the enclosed, environmentally controlled portion of the RSS that supports payload delivery at the pad. At right is Space Shuttle Endeavour with its orange external tank and one solid rocket booster showing behind it. When the RSS is closed around Endeavour, the P6 truss will be moved into the orbiter’s payload bay.
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
9 notes
|
|
#nasa
#space shuttle
#endeavour
#sts 97
|
After rollback of the Rotating Service Structure, Space Shuttle Endeavour shines under spotlights. At the top of the external tank is the Gaseous Oxygen Vent Arm and its vent hood, known as the “beanie cap.” The hood is raised to clear the external tank 2.5 minutes before launch. Endeavour is targeted for launch Nov. 30 at about 10:06 p.m. EST on mission STS-97. In the background, the sky prepares for dawn. The mission to the International Space Station carries the P6 Integrated Truss Segment containing solar arrays and batteries that will be temporarily installed to the Unity connecting module by the Z1 truss, recently delivered to and installed on the Station on mission STS-92.
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
20 notes
|
|
#nasa
#space shuttle
#endeavour
#sts 92
#rollback
|
Space Shuttle Endeavour is nearly through the gate on its backward trek from Launch Pad 39B. A broken cleat on the crawler-transporter forced the reverse movement so the cleat could be repaired before moving up the incline to the top of the pad. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections.
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
8 notes
|
|
#nasa
#space shuttle
#endeavour
#sts 97
#mobile launch platform
|
Removal and replacement of the cracked cleat (shoe) on the crawler-transporter (seen here with the Mobile Launcher Platform and Space Shuttle Endeavour on top) is nearly complete. The cracked cleat was noticed during rollout of Endeavour to Launch Pad 39B. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections.
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
4 notes
|
|
#nasa
#space shuttle
#endeavour
#sts 97
#mobile launch platform
|
With the early morning light behind it, Space Shuttle Endeavour appears to fill the opening in the Vehicle Assembly Building as it begins rollout to Launch Pad 39B on the Mobile Launcher Platform (MLP). At the bottom can be seen the crawler-transporter that moves the combined Shuttle and MLP. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections.
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
18 notes
|
|
#nasa
#space shuttle
#sts 97
#endeavour
#vehicle assembly building
|
Space Shuttle Endeavour and the Mobile Launcher Platform (MLP) start backing through the gate to Launch Pad 39B after a cracked cleat was discovered on the crawler-transporter. Workers near the pad (behind the crawler track) look at the cleats. The vehicle, which moves the MLP and Shuttle at about 1 mph, has a leveling system designed to keep the top of the Space Shuttle vertical while negotiating the 5 percent grade leading to the top of the pad. When the Shuttle-MLP are back on level ground, the crawler tracks will be inspected and the broken cleat repaired.
(Source: mediaarchive.ksc.nasa.gov)
|
|
|
8 notes
|
|
#nasa
#space shuttle
#endeavour
#mobile launch platform
#cape canaveral
#Kennedy Space Center
|